DC Contactor Breaking Current vs. Fuse Clearing method
Check the fault-current gap between the maximum contactor breaking current and the minimum assured fuse breaking current.
The prospective bolted fault uses a resistive Thévenin estimate at nominal and maximum pack voltage. Series cell groups add resistance, matched parallel branches reduce it and the entered external loop includes both conductors. Evaluate the full expected voltage, SOC, temperature, age and fault-path impedance range separately.
Melting I²t represents pre-arcing. Total clearing I²t includes arcing and is compared with the weakest path withstand. Dividing by prospective current squared gives a constant-current time proxy. Current limitation, arc voltage, DC time constant and preheating can make real clearing time differ substantially.
When prospective current exceeds the contactor breaking limit, compare estimated fuse clearing before contact parting and against the damage envelope. Check datasheet time-current bands, minimum and maximum interrupt current, DC polarity, circuit L/R, voltage transients and the tested fuse-contactor combination.
Formulas
Rloop = (Ns × Rcell / Np + Rexternal) / 1000 with input resistances in mΩ; Iprospective = Vpack / RloopConstant-current time proxy = I²t / Iprospective²; surge I²t = Isurge,rms² × pulse durationThermal margin = protected path withstand I²t / fuse total clearing I²tDC voltage headroom = min(fuse DC rating, contactor DC rating at the entered breaking current) − maximum bus voltage
Worked example
The starting scenario gives 2.668 kA prospective current at maximum bus voltage and a 5.618 ms constant-current clearing proxy. The thermal margin ratio is 1.5.